Greenhouse planning software

The greenhouse is the cheap part. Find out what the rest costs.

Site it on your actual land, then get the numbers that decide whether it works: what it costs to heat through a winter, what the water and power runs cost to put in, and the questions you need to take to your building department.

Plan for free. Pay once, when you want the finished blueprint. The planner works in English and Spanish.

10
US climate regions modeled
7
Glazing types, real U-values
4
Fuels costed side by side
160 ft 25 ft setback 12 ft 3,000 gal 200A N irrigation main electrical run 0 40 ft
Right now you have two options

Graph paper, or a consultant

Everyone planning a greenhouse is already doing one of these. Here's what each one actually costs you.

Option one · free

Pencil and graph paper

Draws the boxes. Doesn't know your setbacks, won't total your pipe, can't tell you what it costs to heat in January.

And when you move one greenhouse two feet, you redraw the whole sheet — so most people don't, and the plan stops being true.

Option two · $2,000–$10,000

Hiring a design consultant

Weeks of back and forth for a set of drawings. Worth it on a large commercial build, hard to justify on a first one.

And you pay again for the next property, and again every time you change your mind.

This · $199 once

Draw it, and watch it cost itself

Drag the buildings around and the numbers follow — setbacks, pipe and wire runs, materials, and the heating bill for your climate and your fuel.

Change your mind as often as you like. Use it on every property you ever build on.

It doesn't replace your electrician or your engineer. It gives you real numbers to take to them, which makes that conversation shorter and cheaper.

The paid planner · $199 once

Building the greenhouse? Do it without the beginner's tuition fee

For a first serious build. You don't need experience — you need to know what the structure costs to put up, what it costs to run through a winter, and which questions your county will ask. That's the part that catches people, and it's expensive to learn the other way.

STEP 01

Draw your land

Set the boundary, then drag greenhouses around it. Setbacks, slope and access update as you move things.

STEP 02

Fit it out

Benches, irrigation, lighting and heat. Capacity and power draw populate live as you build.

STEP 03

Get the blueprint

A phased budget, a plot plan your zoning officer will accept, and a build order you can hand to a contractor.

What it does

The costs that don’t show up in the greenhouse quote

Plenty of tools will draw you a pretty greenhouse. The quote covers the structure. These four decide whether building it leaves you better off, and they're the ones a first-timer doesn't know to ask about.

Overheating

The day it cooks, before it cooks

More greenhouse plants die from heat than from cold, and the day that kills them is usually mild. GrowBlueprint works out how far above outside your house runs, and tells you which spring afternoon crosses the line while you're at work.

Running cost

What it costs to heat in January

Ten US regions, design temperatures, seven glazing types with published U-values, and four fuels. The number that turns a good idea into a bad one.

Permits

The questions to ask, not answers to trust

Codes differ by state, county and city. GrowBlueprint prints the exact list to take to your building department — and never tells you you're exempt.

Mistakes

Checked against what actually goes wrong

Every step checks for common planning mistakes documented in extension guidance and greenhouse build research — drainage, orientation, access, ventilation, snow load. Real ones, not filler.

Pricing

One price. No subscription.

One-time
$199

Your complete pre-construction plan. Preview everything for free, pay when you're ready to download.

  • Drag-and-drop site plan with setback dimensions
  • Materials, pipe, wire and trenching totalled from your layout
  • Heating cost estimate for your climate and fuel
  • Summer overheating check against your crop's damage threshold
  • Permit question list for your building department
  • Phased budget and build order, printable
See everything included — all 16 sections
  1. Site plan
  2. What this plan flagged
  3. Climate: heating, overheating and cooling
  4. Greenhouse interior
  5. Specifications
  6. Costs
  7. Questions for your building department
  8. Key numbers
  9. Materials/shopping list
  10. Buying it: what to compare before you order
  11. Phased budget plan
  12. Permits and setbacks checklist
  13. Where this project actually stands
  14. Your answers
  15. Where these numbers come from
  16. Working notes
Start planning — free Purchases opening soon See a finished plan first

No account needed to start planning. Pay when you want the file.
14-day full refund if it doesn't do what this page says — the terms say so in writing.

No tracking cookies. Your data is never sold. No spam, ever — read our privacy commitment.
Questions

Before you buy

Do I need to be technical to use this?

No. You type in numbers about your property and greenhouses, and the tool does the layout and the maths for you.

Does this replace my electrician or engineer?

No — it gives you real planning numbers to bring to them, which saves time and money on that conversation.

Where do the numbers come from?

Published agricultural extension research, cited in the tool itself, so you can check any figure before you spend against it.

Will it tell me my snow load and permit requirements?

No, deliberately. Those are set by building codes that get revised on a cycle, and by your specific site. It prints the questions to ask your building department instead.

What crops is this for?

Tomatoes, cucumbers, peppers, leafy greens, herbs, strawberries, cut flowers and nursery stock — anything where the building is a real investment and the running cost decides whether it works. It is a building planner, not a growing course: it sizes the structure, the water, the power and the heat, and does not tell you how to grow anything.

I have a small build, not a farm. Is this overkill?

It handles a 6×8 kit as happily as a commercial range, including tiered shelving.

What if I build more greenhouses later?

Reopen the file any time and adjust your numbers — it remembers your last inputs.

Is this specific to my state?

The engineering is general: heat loss, structure, water and power sizing work the same everywhere. Anything that is local — permits, setbacks, licensing — it hands back to you as a question, never an answer.

Find out what it costs before you order anything

Draw the property, drop the buildings on it, and watch the running cost appear. If the answer is that it doesn't work where you live, better to see that now than in January.

Plan my build See pricing